Client Background
This client, based in Chicago, Illinois, is renowned for its craft beers. Founded after a European inspiration, it operates a significant brewing facility, emphasizing the science of brewing with state-of-the-art equipment. The company is known for its rigorous standards, including a 143,000 sq. ft. barrel warehouse dedicated to its barrel-aged beers.
Facility Description
The brewery in Chicago features a complex brewing operation, including a 50 barrel JV Northwest 5 vessel system that operates round-the-clock. Their packaging line bottles 500 cases per hour, and the keg line processes 50 kegs every hour. The facility is designed for efficiency and quality, maintaining its beer at a crisp 38 degrees Fahrenheit until shipping.
Requested Maintenance
The client needed a floor renovation in their brewery, covering 4,000 sq. ft. of flooring and 6,000 sq. ft. of ceiling. The urethane cement flooring was crucial for maintaining the facility’s integrity and meeting audit requirements.
Decision Driver and Timing
The primary motivation for this project was the damaged and failing floor, essential for passing audits. The need to maintain operational standards and adhere to industry compliance was a significant factor.
Scope of Work
- Installation of 4,000 sq. ft. of urethane cement flooring.
- Painting of 6,000 sq. ft. of ceiling area.
- Coordination with other trades to ensure timely completion.
- Work performed during a planned shutdown for minimal operational disruption.
Notable Details
Collaboration with Other Trades
To meet the tight schedule, our team worked efficiently alongside other trades, ensuring that the project was completed on time without compromising the quality of work.
Strategic Shutdown
The project was strategically timed during a facility shutdown. This planning minimized operational disruptions and allowed for a more efficient workflow.
Industry Compliance
The choice of urethane cement flooring was vital for its durability and compliance with industry standards, essential for a facility like our client's that prides itself on quality and precision.
Client Satisfaction
Our client was highly satisfied with the completion of the project, which not only enhanced the functionality and safety of their facility but also ensured compliance with industry standards. The successful coordination and completion of the project within the scheduled shutdown period were particularly appreciated.