Client Background
This client, a leader in the fertilizer and chemical industry, is recognized for its commitment to sustainability and efficient operations. As an innovator in water, hygiene, and energy technologies, they help companies around the globe achieve clean water, safe food, abundant energy, and healthy environments. With its headquarters in Naperville, Illinois, our client serves an essential role in offering comprehensive solutions to meet the global challenges of food safety, clean water, and energy.
Facility Description
Located near the headquarters in Naperville, the facility is part of the company's extensive network dedicated to developing and implementing technologies that drive sustainable practices. Like others under the company’s umbrella, it's instrumental in pushing forward the company's mission. The project focused on the south and west faces of the building.
Requested Maintenance
The project's primary objective was to clean and seal the building's south and west walls. The maintenance work was extensive, requiring the use of lifts, booms, swing stages, and ladders to access the entire scope. The performance of the task was strategically designed to minimize disruption and ensure the facility's appearance and structural integrity were enhanced.
Decision Driver and Timing
The company’s dedication to maintaining high standards in its facilities drove the decision for this project. The primary goals were to protect the building against weather elements and to uphold the brand’s image as a clean and efficiently run operation. The project's timing was carefully planned to minimize operational disruptions and maintain rigorous daily schedule.
Scope of Work
- The project kicked off with barricading the designated areas to ensure safety and minimize disruption
- The entire building was thoroughly power washed using a 3,000 PSI power washer to remove dirt, debris, and other contaminants
- After cleaning, two coats of Hydro Seal Clear Waterproofer were applied to seal the building effectively, providing long-lasting protection from moisture penetration and environmental damage
- Throughout the project, the team checked caulk on joints while elevated on booms and swing stages, addressing any sealant issues immediately to ensure a comprehensive maintenance solution
Notable Details
Advanced Access Techniques
This project required the use of advanced access techniques, including lifts, booms, swing stages, and ladders, demonstrating Painters USA's ability to tackle complex maintenance challenges safely and effectively.
Enhanced Aesthetics and Protection
The completion of the clean and seal project not only enhanced the building's aesthetic appeal but also significantly increased its protection against the elements. This outcome aligns with the company’s commitment to sustainability and operational efficiency.
Minimal Disruption
Strategic planning and execution allowed for minimal disruption to operations, a testament to Painters USA’s commitment to client needs and project management excellence.
Client-Contractor Partnership
The existing relationship between Painters USA and the client facilitated a successful project outcome. Our knowledge of existing standards and operational requirements ensured that the project was executed efficiently, with minimal impact on daily operations.
Safety
Adhering to OSHA guidelines and utilizing proper PPE, Painters USA ensured a safe environment for both the project crew and the client’s employees. The use of barricades and caution in operating elevated platforms underscored our commitment to safety.
Client Satisfaction
Our client’s criteria for choosing Painters USA for this project were based on past positive experiences, and once again, Painters USA delivered. The completed work received commendations for its quality, efficiency, and minimal disruption to the facility’s regular activities, further solidifying the trusted partnership.