Client Background
Jones Lang LaSalle (JLL) stands as a beacon of innovation in the real estate sector. With a commitment to transforming the built environment, JLL manages an impressive 4.6 billion sq. ft. in property and facilities serving a diverse clientele across industries such as banking, energy, healthcare, and technology.
Facility Description
The project was centered on a substantial tilt-up construction industrial building located in Aurora, Illinois. Occupied by a leading food manufacturer and leased from JLL, this facility spans an impressive 100,000 sq. ft. It plays a pivotal role in the client's operations, necessitating a professional and aesthetically pleasing appearance to reflect the brand's commitment to quality and uniformity across its locations.
Requested Maintenance
The primary objective was to address the facility's outdated and worn exterior, particularly focusing on the fading color scheme and failing vertical caulk joints. These issues not only detracted from the building's professional appearance but also posed risks of water, snow, and ice damage to the structure.
Decision Driver and Timing
The drive for this extensive repaint and caulking project stemmed from a desire to align the facility's aesthetic with JLL's corporate branding, ensuring a consistent and professional look across all locations. Additionally, the need to protect the building's integrity from weather-related damage was paramount. The project was expedited to be completed within weeks, showcasing an impressive turnaround time that minimized disruption and maximized efficiency.
Scope of Work
The project involved a comprehensive exterior repaint of the entire 100,000 sq. ft. industrial building. High-quality, durable paint was selected to withstand the harsh Midwestern weather conditions, ensuring longevity and maintaining the building's professional appearance. The project also included meticulous caulking of vertical joints to safeguard against water intrusion, protecting the structure from potential damage caused by snow and ice.
Notable Details
Swift Execution
Demonstrating remarkable efficiency, the project was completed in a matter of weeks rather than the anticipated months. This rapid turnaround minimized operational disruptions and showcased the team's commitment to meeting the client's needs promptly.
Color Branding Consistency
A key aspect of the project was the careful selection of colors to match JLL's other locations, reinforcing the brand's identity and ensuring a cohesive and professional look across its portfolio.
Enhanced Protection
The meticulous caulking work not only improved the building's aesthetic but also provided enhanced protection against water, snow, and ice, ensuring the facility's structural integrity over time.
Client-Contractor Collaboration
The successful completion of this project underscored the effective collaboration between JLL and the painting contractor. Open communication and a clear understanding of the project goals ensured that the work was done efficiently, with minimal impact on the facility's operations.
Client Satisfaction
The project's completion to the highest standards of quality and within an expedited timeframe led to high client satisfaction. JLL appreciated the contractor's ability to address their needs promptly, ensuring the facility's appearance and integrity were maintained according to their high standards. This project stands as a testament to Painter’s expertise in managing large-scale industrial painting projects efficiently and effectively.