Client and Facility Overview
Our client, a well-known industrial property manager, operates several high-capacity facilities designed to accommodate a wide range of tenants. With a focus on efficiency and safety, the property manager ensures that all of its spaces meet stringent standards before new tenants move in.
Requested Maintenance
As part of preparing the facility for a new tenant, the client requested an update to several safety-critical points. This included:
- Painting dock plates in the shipping and receiving area
- Painting ceiling support columns
- Painting bollards
- Painting both interior and exterior railings
- Additionally, painting the interior walls white to enhance brightness and visibility
Once the tenant is fully settled, we'll also proceed with electrostatically painting their machinery.
Decision Driver and Timing
The urgency of this project was driven by an earlier-than-expected move-in date for the new tenant. Safety and visual aesthetics were paramount, resulting in the use of bright safety yellow paint for improved visibility and white for better light reflection within the facility.
Scope of Work
- Area Assessment and Preparation: Assessment and preparation of all areas needing painting
- Safety Yellow Application: Application of safety yellow paint to:
- Dock plates
- Ceiling support columns
- Bollards
- Interior and exterior railings
- Interior Wall Brightening: Application of white paint on all interior walls to improve brightness and reduce lighting costs
- Future Painting Plans: Scheduling for future electrostatic painting of tenant machinery
Notable Details
Enhancing Safety and Efficiency
Bright safety yellow paint was used strategically to draw attention to critical areas, ensuring that both workers and new tenants can navigate the space safely and efficiently.
Improved Lighting Without Added Costs
Painting the interior walls white not only refreshed the look but also enhanced natural and artificial light within the facility. This solution resulted in better visibility and reduced the need for additional lighting, leading to cost savings.
Client-Contractor Partnership
Having established a strong working relationship with the property manager, we understood the urgent requirements and time constraints, allowing us to execute the project quickly and efficiently without compromising quality.
Scheduled Follow-Up
To accommodate the tenant's schedule, we scheduled a follow-up electrostatic painting session on their machinery to ensure a seamless transition and minimal disruption to their established operations.
Client Satisfaction
Our client was more than pleased with the results and appreciated our ability to meet tight deadlines while improving the safety and efficiency of the facility. The combination of timely execution and quality workmanship strengthens our ongoing partnership.
Ready to enhance the safety and appearance of your facility? Request an Estimate today to see how our experts can help transform your space.